The Orbital LSG quality provision standard text codes and Supplier Data Requirements Lists (SDRLs) are found in the links below. These provisions define the parameters of the inspection and certification requirements required as part of any request for cost information and any resulting purchase order. The respective purchase order or request for cost information sent to you will define which revision number you should utilize in the performance of your efforts. Should you encounter questions regarding the use or submission of data relative to this document, please contact the buyer as noted in purchase order or request for cost information.
When a quality assurance specification is defined in a purchase order, the supplier's quality assurance system must meet the requirements of that specification. The level of the quality or inspection system required will depend upon the type of hardware being procured.
Contact the buyer identified in the RFQ or purchase order if you require additional information regarding supplier quality assurance requirements.
Code |
Title |
Code |
Title |
| Basic Quality Requirements |
| 0111 |
Minimum Quality System Requirements |
0141 |
Corrective Action Requirements |
| 0112 |
Supplier’s Responsibilities for Continuous Approval as an Orbital Supplier |
0162 |
Records Retention Requirements |
| 0114 |
Basic Quality System Requirements |
0163 |
Records Retention Requirements -
7 Years |
| 0115 |
Calibration Supplier’s Quality System Requirements |
0164 |
Records Retention Requirements -
20 Years + |
| 0116 |
Special Process Supplier’s Quality System Requirements |
0191 |
Responses to Industry Investigations Required |
| 0121 |
Certificate of Conformance Required |
0192 |
Procurement and Production of Printed Wiring Assemblies (PWAs) for Orbital Launch Vehicle Systems |
| 0131 |
Nonconforming Materials Requirements |
0193 |
Procurement and Production of Printed Wiring Boards (PWBs) for Orbital Launch Vehicle Systems |
|
|
|
|
| Quality Systems |
| 0212 |
Quality System Complying With ANSI/ASQ/ISO 9001 Required |
0272 |
SEI Software CMM Level 3 Required |
| 0241 |
Quality System Complying With SAE AS9100 Required |
0285 |
Software Verification and Software Validation Required |
| 0271 |
SEI Software CMM Level 2 Required |
0292 |
Software Change Tracking Required |
| |
|
|
|
| Calibration |
| 0311 |
Requirements for Calibration Services |
|
|
| |
|
|
|
| Supplied Property Control |
| 0411 |
Government Property Provided |
0431 |
Special Tooling Requirements |
| 0421 |
Orbital Property Provided |
|
|
| |
|
|
|
| Manufacturing |
| 0521 |
ESD Precautions Required |
0581 |
Notification of Changes to Processes Required |
| 0532 |
Approved Welding Process Sources Required |
0582 |
Approval of Changes to Processes Required |
| 0533 |
Approved Radiographic and Other Defined Nondestructive Testing (NDT) Process Sources Required |
0591 |
Orbital Supplied Manufacturing Traveler Completion Required |
| 0571 |
Delivery Hold – Unreleased Product Definition |
0592 |
Rework or Repair Documentation Requirements for PWB and PWA Mfg Support |
| |
|
|
|
| Testing |
| 0612 |
Final Acceptance Test Report Submittal Required |
0623 |
Test Failure Notification Required |
| 0621 |
Test Report History Submittal Required |
0624 |
Test Failure Notification Required (COTS) |
| 0622 |
Notification of Testing Required |
|
|
| |
|
|
|
| Inspection |
| 0711 |
Inspection Reports Submittal Required |
0732 |
Close Out Photographs Required – Items that Include Printed Wiring Assemblies |
| 0722 |
First Article Inspection per SAE AS9102 Required |
0733 |
Manufacturing Assembly/Inspection Documentation |
| 0731 |
Close Out Photographs Required |
0734 |
Validation Of Solder Workmanship Utilizing X-Ray Analysis |
| |
|
|
|
| On-Site Inspection |
| 0811 |
Orbital Inspection of Completed Item at Source (Source Inspection) Required |
0832 |
Government Insight |
| 0812 |
Orbital Inspection of Bare PWB Required Prior to Subsequent Operations |
0841 |
Contract Kick-Off Meeting at Supplier’s Facility Required |
| 0813 |
Hardware Acceptance Review (HAR) Required |
0851 |
Pre-Environmental Lot Acceptance Test (Pre-ELAT) Inspection at Source Required |
| 0821 |
Orbital Source Surveillance Required |
0861 |
Mission Assurance Product & Process Review-MAPPR |
| 0831 |
Government Oversight |
|
|
| |
|
|
|
| Traceability and Identification |
| 0911 |
Single Date Code Required |
0932 |
Traceability Requirements |
| 0912 |
Date/Lot Code Part Identification Required |
0933 |
Supply Chain Traceability of EEE Items Required |
| 0921 |
Shelf Life Requirements |
0934 |
Wafer Level Traceability Identification Submittal Required |
| 0923 |
Shelf Life Limted Item-Data Submittal Required & 75% Life Remaining |
0951 |
Manufacturer’s Identification Required |
| 0924 |
Shelf Life Limited Item-Data Submittal Required & 50% Life Remaining |
0961 |
For Orbital Internal Use, Only-Note To Orbital Receiving Inspection |
| |
|
|
|
| Configuration Management |
| 1022 |
As-Designed/As-Built Configuration Record Required |
|
|
| |
|
|
|
| Nonconforming Material |
| 1211 |
MRB Authority (Limited) Granted to Supplier |
1242 |
Requirements for Approval of Nonconformance in Supplier Designed Items |
| 1212 |
MRB Authority Granted to Supplier |
|
|
| |
|
|
|
| Certifications |
| 1311 |
Manufacturer’s Certifications Submittal Required |
1351 |
Sample Material Submittal Required |
| 1312 |
Connector and Backshell Manufacturer’s Certifications Submittal Required |
1352 |
Sample PWB and Documentation Submittal Required |
| 1321 |
Material and Process Certifications Submittal Required |
1353 |
Sample PWB Retention and Documentation Submittal Required |
| 1322 |
Material Certifications Submittal Required |
1354 |
Sample PWB and Documentation Retention Required |
| 1323 |
Process Certifications Submittal Required |
1361 |
FAA TSO Authorization Required |
| 1331 |
Nondestructive Test (NDT) Certification Submittal Required, Other Than Radiographic |
1362 |
FAA Airworthiness Certification Documentation Required |
| 1341 |
Radiographic Certifications Required |
1371 |
Prohibited Parts, Materials, and Processes |
| 1342 |
Radiographic Certifications and Radiographic Submittal Required |
1381 |
Manufacturer's Authorized/Franchised Distributor's Certificate of Conformance (CofC) Retention Required |
| |
|
1382 |
Manufacturer's Authorized/Franchised Distributor's Certificate of Conformance (C of C) Delivery Required |
| |
|
|
|
| Process Improvement |
| 1421 |
Key Characteristics Inspection and Documentation Process Required |
1431 |
Foreign Object Debris (FOD) Prevention Program Required |
| |
|
|
|
| GIDEP |
| 1511 |
GIDEP Participation Required |
1521 |
GIDEP Alert Pertains To This Order |
| |
|
|
|
| Subsequent Processing |
| 1611 |
Subsequent Orbital Processing Required – Calibration |
1618 |
Subsequent Orbital Processing Required |
| 1612 |
Subsequent Orbital Processing Required – Testing |
1621 |
Subsequent Test Data Validation Required – Certification Test Report Validation |
| 1613 |
Subsequent Orbital Processing Required – Inspection |
1631 |
Subsequent Orbital Processing Required – Government Property Control – STE |
| 1614 |
Subsequent Orbital Processing Required – Identification |
1632 |
Subsequent Orbital Processing Required – Government Property Control – ST |
| 1616 |
Subsequent Orbital Processing Required – Tooling |
1633 |
Subsequent Orbital Processing Required – Government Property Control – OPE |
| 1617 |
Subsequent Orbital Processing Required – Item Validation |
1634 |
Subsequent Orbital Processing Required – Government Property Control – APP |
| |
|
|
|
| Design |
| 1731 |
Requirements for Approval of Changes In Supplier's Design |
1741 |
Part Substitutions Prohibited |
| 1732 |
Requirements for Notification of Changes in Supplier’s Design |
1742 |
Obsolete Parts Prohibited |
| |
|
|
|
| Shipping, Packaging, and Handling |
| 1811 |
Packaging Requirements for Printed Wiring Board (PWB) Shipments |
1813 |
Packaging Requirements for Moisture Sensitive Surface Mount Device Shipments |
| 1812 |
Packaging Requirements for Electrostatic Discharge (ESD) Sensitive Item Shipments |
1814 |
Moisture Sensitivity Level Identification and Appropriate Packaging |
| 1841 |
ESD Precautions for Electro-Explosive Device Required |
1821 |
Packaging Requirements for Structures and Machined Components |
| |
|
|
|
| Miscellaneous Supply Chain Direction |
| 1921 |
See Statement of Work (SOW) for Quality Requirements |
1935 |
Resctrictions On Electrical Connectors/Backshells Manufacturred By Sunbank |
| 1922 |
See FM40-042 For SDRL Requirements |
1941 |
Training to the Requirements of Orbital’s Document TM-8575 is Required |
| 1931 |
Restrictions on Electrical Connectors Manufactured by Aero-Electric Connector, Inc. |
1942 |
Training to the Requirements of Orbital’s Document TM-455 is Required |
| 1932 |
Restrictions on Stacked Capacitors Manufactured by UTC |
1951 |
Warranty Return, All Previous Quality Requirements Apply |
| 1933 |
Manufacturer of this Item must be Amphenol, Cage Code 77820 |
1961 |
Procurement from a Recognized Source Required |
| 1934 |
Tin Material Restrictions |
1962 |
Certification of Procurement From an Authorized/Franchised Source Required |
| |
|
|
|
| Safety |
| 8011 |
MSDS Submittal Required |
8041 |
Mercury Free Statement Required |
| 8021 |
Labeling of Ozone Depleting Substances Required |
8050 |
DFARS 252.223-7002 Safety Precautions for Ammunition and Explosives |
| 8031 |
Chemical Inventory for Air Pollution Reporting (Maricopa County) |
|
|
| Supplier Data Requirements List |
| Nonrecurring Documentation |
| SDRL-100 |
Design Baseline |
SDRL-127 |
Shock And Vibration Analysis |
| SDRL-101 |
Manufacturing Baseline |
SDRL-128 |
Dynamic Analysis |
| SDRL-102 |
Test Baseline |
SDRL-129 |
Master Equipment List |
| SDRL-103 |
Parts List Parts List Form |
SDRL-130 |
Mass Properties Report |
| SDRL-104 |
Subtier Supplier List |
SDRL-131 |
Long Lead Hardware List |
| SDRL-106 |
Parts, Materials, and Processes Management Plan (PMPMP) |
SDRL-132 |
CAH Components List |
| SDRL-107 |
Acceptance Test Plans and Procedure (ATP) |
SDRL-133 |
Interface Control Document |
| SDRL-108 |
Qualification Test Plan and Procedure (QTP) |
SDRL-134 |
Structural Models |
| SDRL-109 |
Configuration Management Plan |
SDRL-135 |
Suite of Elec Pkg Electronic Components Analysis |
| SDRL-110 |
Software Configuration Management Plan |
SDRL-136 |
Suite of Elec Pkg Electromechanical Components |
| SDRL-111 |
Software Quality Assurance Plan |
SDRL-137 |
Validated Earned Value Mgmt System (EVMS) |
| SDRL-112 |
Source Code |
SDRL-138 |
Integrated Baseline Review (IBR) |
| SDRL-113 |
Software Development Plan |
SDRL-139 |
Contract Work Breakdown Structure (CWBS) |
| SDRL-114 |
Software Requirements Specification |
SDRL-140 |
Contract Cost Data Report (CCDR) |
| SDRL-115 |
Software Test Plan |
SDRL-141 |
Design Life Analysis |
| SDRL-116 |
Supplier Drawing |
SDRL-142 |
Non-linear Model Required |
| SDRL-117 |
Top Level Assembly Drawing |
SDRL-143 |
Verification Cross Reference Matrix Documentation Required |
| SDRL-118 |
Qualification Test Report (QTR) |
SDRL-144 |
Analysis - General Requirements |
| SDRL-119 |
Preliminary Design Review (PDR) |
SDRL-145 |
Transition from Engineering to Qual/Production Plan |
| SDRL-120 |
Critical Design Review (CDR) |
SDRL-146 |
Letter of Competent Authority |
| SDRL-121 |
Lot Acceptance Test Plans and Procedure |
SDRL-147 |
Fault Tree Analysis |
| SDRL-123 |
Parts Application Stress Analysis |
SDRL-148 |
Failure Modes, Effects, and Critical Analysis |
| SDRL-124 |
Reliability Prediction |
SDRL-149 |
Process Failures Modes and Effects Analysis |
| SDRL-125 |
Mechanical Stress Analysis |
SDRL-150 |
Design Baseline: As Designed Parts and Materials Lists (ADPML) |
| SDRL-126 |
Thermal Analysis |
SDRL-151 |
Production Readiness Review - PRR |
| |
|
SDRL-152 |
Self-Assessment of PMP Requirements |
| |
|
|
|
| Recurring Documentation, Deliver as Required |
| SDRL-300 |
Program Plan or Master Schedule |
SDRL-310 |
Software Configuration Management Periodic/Milestone Auditing |
| SDRL-301 |
Program Milestone Schedule |
SDRL-311 |
Integrated Master Schedule |
| SDRL-302 |
Progress Report |
SDRL-312 |
Cost Performance Report (CPR) |
| SDRL-303 |
Supplier Quality Metrics |
SDRL-313 |
Contractor Financial Mgmt. Reports (CFMR) |
| SDRL-305 |
Software Process Metrics |
SDRL-314 |
Contract Funds Status Report (CFSR) |
| SDRL-307 |
Software Processes Periodic/Milestone Auditing |
SDRL-315 |
Red Flag Report |
| SDRL-308 |
Software Configuration Metrics |
SDRL-316 |
EEE Component (Destructive Physical Analysis) DPA Report Required |
| SDRL-309 |
Software Configuration Management Periodic/Milestone Status Reporting |
SDRL-317 |
PMP Approval Request Form Submittal |
| |
|
|
|