AS9100 Rev B and ISO 9001:2000 Registered  
Satellites & Space
Systems
Space Launch
Vehicles
Missile Defense
Systems
Human Spaceflight &
Exploration Systems
Space Technical
Services
Supplier Performance Expectations
Calendar of Events
LSG Quality Provisions
Points of Contact

Orbital Launch Systems Group (LSG)
Supplier Quality Assurance Provisions

The Orbital LSG quality provision standard text codes and Supplier Data Requirements Lists (SDRLs) are found in the links below. These provisions define the parameters of the inspection and certification requirements required as part of any request for cost information and any resulting purchase order. The respective purchase order or request for cost information sent to you will define which revision number you should utilize in the performance of your efforts. Should you encounter questions regarding the use or submission of data relative to this document, please contact the buyer as noted in purchase order or request for cost information.

When a quality assurance specification is defined in a purchase order, the supplier's quality assurance system must meet the requirements of that specification. The level of the quality or inspection system required will depend upon the type of hardware being procured.

Contact the buyer identified in the RFQ or purchase order if you require additional information regarding supplier quality assurance requirements.

Supplier Data Requirements List:

Code

Title

Code

Title

Basic Quality Requirements

0111

Minimum Quality System Requirements

0131

Nonconforming Materials Requirements

0112

Supplier’s Responsibilities for Continuous Approval as an Orbital Supplier

0141

Corrective Action Requirements

0114

Basic Quality System Requirements

0162

Records Retention Requirements

0115

Calibration Supplier’s Quality System Requirements

0191

Responses to Industry Alert Investigations Required

0116

Special Process Supplier’s Quality System Requirements

   

0121

Certificate of Conformance Required

   
 

Quality Systems

0212

Quality System Complying With ANSI/ASQ/ISO 9001:2000 Required

0272

SEI Software CMM Level 3 Required

0241

Quality System Complying With SAE AS9100 Required

0285

Software Verification and Software Validation Required

0271

SEI Software CMM Level 2 Required

0292

Software Change Tracking Required

       

Calibration

0311

Requirements for Calibration Services

   
       

Supplied Property Control

0411

Government Property Provided

0431

Special Tooling Requirements

0421

Orbital Property Provided

   
       

Manufacturing

0521

ESD Precautions Required

0581

Notification of Changes to Processes Required

0532

Approved Welding Process Sources Required

0582

Approval of Changes to Processes Required

0533

Approved Nondestructive Testing (NDT) Process Sources Required

0591

Orbital Supplied Manufacturing Traveler Completion Required

0571

Delivery Hold – Unreleased Product Definition

0592

Rework or Repair Documentation Requirements for PWB and PWA Mfg Support

       

Testing

0612

Final Acceptance Test Report Submittal Required

0623

Test Failure Notification Required

0621

Test Report History Submittal Required

0624

Test Failure Notification Required (COTS)

0622

Notification of Testing Required

   
       

Inspection

0711

Inspection Reports Submittal Required

0732

Close Out Photographs Required – Items that Include Printed Wiring Assemblies

0722

First Article Inspection per SAE AS9102 Required

0733

Manufacturing Assembly/Inspection Documentation

0731 Close Out Photographs Required    
       

On-Site Inspection

0811

Orbital Inspection of Completed Item at Source (Source Inspection) Required

0831

Government Source Inspection Required

0812

Orbital Inspection of Bare PWB Required Prior to Subsequent Operations

0832 Government Insight

0813

Hardware Acceptance Review (HAR) Required

0841

Contract Kick-Off Meeting at Supplier’s Facility Required

0821

Orbital Source Surveillance and Right of Entry Notice

0851

Pre-Environmental Lot Acceptance Test (Pre-ELAT) Inspection at Source Required

       

Traceability and Identification

0911

Single Date Code Required

0933

Supply Chain Traceability of EEE Items Required

0912

Date/Lot Code Part Identification Required

0934

Waiver Level Traceability Identification Submittal Required

0921

Shelf Life Requirements

0951

Manufacturer’s Identification Required

0932 Traceability Requirements    
       

Configuration Management

1022

As-Designed/As-Built Configuration Record Required

   
       

Nonconforming Material

1211

MRB Authority (Limited) Granted to Supplier

1242

Requirements for Approval of Nonconformance in Supplier Designed Items

1212

MRB Authority Granted to Supplier

   
       

Certifications

1311

Manufacturer’s Certifications Submittal Required

1351

Sample Material Submittal Required

1312 Connector and Backshell Manufacturer’s Certifications Submittal Required 1352 Sample PWB and Documentation Submittal Required

1321

Material and Process Certifications Submittal Required

1353

Sample PWB Retention and Documentation Submittal Required

1322

Material Certifications Submittal Required

1354

Sample PWB and Documentation Retention Required

1323

Process Certifications Submittal Required

1361

FAA TSO Authorization Required

1331

Nondestructive Test (NDT) Certifications Submittal Required

1362

FAA Airworthiness Certification Documentation Required

1341

X-Ray Certifications Submittal Required

1371

Prohibited Parts, Materials, and Processes Certificate of Compliance Required

1342

X-Ray Certifications and Film Submittal Required

1381

Manufacturer’s/Authorized Distributor’s Certifications Required

 

   
       

Process Improvement

1421

Key Characteristics Inspection and Documentation Process Required

1431

Foreign Object Debris (FOD) Prevention Program Required

       

GIDEP

1511

GIDEP Participation Required

1521

GIDEP Alert Pertains To This Order

       

Subsequent Processing

1611

Subsequent Orbital Processing Required – Calibration

1621

Subsequent Test Data Validation Required – Certification Test Report Validation

1612

Subsequent Orbital Processing Required – Testing

1631

Subsequent Orbital Processing Required – Government Property Control – STE

1613

Subsequent Orbital Processing Required – Inspection

1632

Subsequent Orbital Processing Required – Government Property Control – ST

1614

Subsequent Orbital Processing Required – Identification

1633

Subsequent Orbital Processing Required – Government Property Control – OPE

1616

Subsequent Orbital Processing Required – Tooling

1634

Subsequent Orbital Processing Required – Government Property Control – APP

1617

Subsequent Orbital Processing Required – Item Validation

 

 

       

Design

1731

Requirements for Approval of Changes In Supplier's Design

1741

Part Substitutions Prohibited

1732

Requirements for Notification of Changes in Supplier’s Design

1742

Obsolete Parts Prohibited

       

Shipping, Packaging, and Handling

1811 Packaging Requirements for Printed Wiring Board (PWB) Shipments 1813 Packaging Requirements for Moisture Sensitive Surface Mount Device Shipments

1812

Packaging Requirements for Electrostatic Discharge (ESD) Sensitive Item Shipments

1821

Packaging Requirements for Structures and Machined Components

       

Miscellaneous Supply Chain Direction

1921

See Statement of Work (SOW) for Quality Requirements

1934

Tin Material Restrictions

1922

See FM40-042 For SDRL Requirements

1941

Training to the Requirements of Orbital’s Document TM-8575 is Required

1931

Restrictions on Electrical Connectors Manufactured by Aero-Electric Connector, Inc.

1942

Training to the Requirements of Orbital’s Document TM-455 is Required

1932

Restrictions on Stacked Capacitors Manufactured by UTC

1951

Warranty Return, All Previous Quality Requirements Apply

1933

Manufacturer of this Item must be Amphenol, Cage Code 77820

1961

Procurement from a Recognized Source Required

       

Safety

8011

MSDS Submittal Required

8031

Chemical Inventory for Air Pollution Reporting (Maricopa County)

8021

Labeling of Ozone Depleting Substances Required

8041

Mercury Free Statement Required

 

Supplier Data Requirements List

Nonrecurring Documentation

SDRL-100

Design Baseline

SDRL-121

Lot Acceptance Test Plans and Procedure

SDRL-101

Manufacturing Baseline

SDRL-123

Parts Application Stress Analysis

SDRL-102

Test Baseline

SDRL-124

Reliability Prediction

SDRL-103

Parts List

SDRL-125

Mechanical Stress Analysis

SDRL-104

Subtier Supplier List

SDRL-126

Thermal Analysis

SDRL-106

Parts, Materials, and Processes Management Plan (PMPMP)

SDRL-127

Shock And Vibration Analysis

SDRL-107

Acceptance Test Plans and Procedure (ATP)

SDRL-128

Dynamic Analysis

SDRL-108

Qualification Test Plan and Procedure (QTP)

SDRL-129

Master Equipment List

SDRL-109

Configuration Management Plan

SDRL-130

Mass Properties Report

SDRL-110

Software Configuration Management Plan

SDRL-131

Long Lead Hardware List

SDRL-111

Software Quality Assurance Plan

SDRL-132

CAH Components List

SDRL-112

Source Code

SDRL-133

Interface Control Document

SDRL-113

Software Development Plan

SDRL-134

Structural Models

SDRL-114

Software Requirements Specification

SDRL-135

Suite of Elec Pkg Electronic Components Analysis

SDRL-115

Software Test Plan

SDRL-136

Suite of Elec Pkg Electromechanical Components

SDRL-116

Supplier Drawing

SDRL-137 Validated Earned Value Mgmt System (EVMS)

SDRL-117

Top Level Assembly Drawing

SDRL-138 Integrated Baseline Review (IBR)

SDRL-118

Qualification Test Report (QTR)

SDRL-139 Contract Work Breakdown Structure (CWBS)
SDRL-119 Preliminary Design Review (PDR) SDRL-140 Contract Cost Data Report (CCDR)
SDRL-120 Critical Design Review (CDR) SDRL-144 Analysis - General Requirements
       

Recurring Documentation, Deliver as Required

SDRL-300

Program Plan or Master Schedule

SDRL-309

Software Configuration Management Periodic/Milestone Status Reporting

SDRL-301

Program Milestone Schedule

SDRL-310

Software Configuration Management Periodic/Milestone Auditing

SDRL-302

Progress Report

SDRL-311 Integrated Master Schedule

SDRL-303

Supplier Quality Metrics

SDRL-312

Cost Performance Report (CPR)

SDRL-305 Software Process Metrics

SDRL-313

Contractor Financial Mgmt. Reports (CFMR)

SDRL-307 Software Processes Periodic/Milestone Auditing

SDRL-314

Contract Funds Status Report (CFSR)

SDRL-308 Software Configuration Metrics SDRL-315 Red Flag Report
       
Corporate Information | Investor Relations | News Room | Images/Video | Careers | Suppliers | Company Store | Contact

©2009 Orbital Sciences Corporation. All Rights Reserved